New Trailers and Interviews
Sign Up to FilmBooster
- Get personalized recommendations from Streaming, Cinema and Blu-ray releases.
- Compile a watchlist of movies and series you wanna see.
- Help us complete the database of world cinema.
- Get inspired by your friends' ratings and reviews.
- Get notified when your desired movie or series is being shown somewhere.
- Build your profile and become a widely respected film critic.
Most Visited Movies
Hit Man (2023) |
Bad Boys: Ride or Die (2024) |
The Fall Guy (2024) |
Furiosa: A Mad Max Saga (2024) |
Under Paris (2024) |
Bird Atlas (2021) |
Civil War (2024) |
Planet of the Apes (1968) |
The Watched (2024) |
Most Visited Series
Star Wars: The Acolyte (2024) |
The Tattooist of Auschwitz (2024) |
Becoming Karl Lagerfeld (2024) |
Dark Matter (2024) |
Star Wars: The Acolyte - Lost / Found (2024) |
Star Wars: The Acolyte - Episode 3 (2024) |
Fallout (2024) |
Star Wars: The Acolyte - Revenge / Justice (2024) |
The Boys (2019) |
Opening in Cinemas
Treasure (2024) |
on 14/06/2024 14/06 |
Star Trek III: The Search for Spock (1984) |
on 14/06/2024 14/06 |
Death of a City (2022) |
on 14/06/2024 14/06 |
Next Sohee (2022) |
on 14/06/2024 14/06 |
Inside Out 2 (2024) |
on 14/06/2024 14/06 |
Sasquatch Sunset (2024) |
on 14/06/2024 14/06 |
Sorcery (2023) |
on 14/06/2024 14/06 |
Wilding (2023) |
on 14/06/2024 14/06 |
Ama Gloria (2023) |
on 14/06/2024 14/06 |
Streaming Originals
Desde el mañana (2024) (series) |
Disney+ |
Mysteries of the Terracotta Warriors (2024) |
Netflix |
Skazana - Season 4 (2024) (season) |
Max |
Hit Man (2023) |
Netflix |
Becoming Karl Lagerfeld (2024) (series) |
Disney+ |
Hierarchy (2024) (series) |
Netflix |
Fantasmas (2024) (series) |
Max |
Queenie (2024) (series) |
Hulu |
Criminal Minds (2005) (series) |
Paramount+ |
New on Blu-ray
Joe Versus the Volcano (1990) |
from 17/06/2024 17/06 |
The Ice Pirates (1984) |
from 17/06/2024 17/06 |
A Dry White Season (1989) |
from 17/06/2024 17/06 |
Vision Quest (1985) |
from 17/06/2024 17/06 |
To Kill with Intrigue (1977) |
from 17/06/2024 17/06 |
Invasion of the Body Snatchers (1978) |
from 17/06/2024 17/06 |
The Whole Truth (1958) |
from 17/06/2024 17/06 |
Action Jackson (1988) |
from 17/06/2024 17/06 |
New Reviews by TOP Users
Honestly, this was probably the worst series I wasted my time on this anime season. The animation was weak, the music was forgettable, but those weren’t even the main issues. The biggest problem for me was the main character. His behavior and voice acting made him incredibly unlikable. Aoi Shouta's voice just doesn't…
(more)EvilPhoEniX–Hit Man(2023)
Richard Linklater is quite an unexplored director for me, his work has always passed me by, so I didn't have high expectations and I wasn't too impressed either. The action was non-existent, the humour minimal to nonexistent and the whole thing hinged on the likable duo of Glen Powell and the beautiful Adria Arjona,…
(more)Fans of Dumas' might not agree, but "The Three Musketeers" is at best "just" period-conditioned consumable reading, excessively naive and heavily romanticized. Directors attempting to adapt the book were aware of its limitations and the resulting risks for today's audience, often opting for exaggeration and comedic…
(more)NinadeL–Sisi & Ich(2023)
Each generation interprets the myth of the empress a bit differently. This is a highly original interpretation and one of the few that focuses on the end of her life as the main theme. Her relationship with the last lady-in-waiting and the events in Corfu. The artistic license taken is quite wild, especially regarding…
(more)New Reviews by Progressing Users
Honestly, this was probably the worst series I wasted my time on this anime season. The animation was weak, the music was forgettable, but those weren’t even the main issues. The biggest problem for me was the main character. His behavior and voice acting made him incredibly unlikable. Aoi Shouta's voice just doesn't…
(more)Necrotongue–Detective Forst(2024)
After watching Kolory zła: Czerwień, Netflix suggested this series to me. Little did I know, it was Netflix's sly revenge for all my long-standing complaints about their content. Like an idiot, I walked right into the trap. I’m fairly certain this is the worst Polish series I’ve ever seen. If I’m wrong, then it's…
(more)Well, the series was headed towards this moment the whole time, so it’s only fitting that the grand, supposedly clarifying finale gets a Boo! rating from me. On the other hand, hats off to the confidence of the creators who believe so strongly in their skills and the quality of their work that they’re going to shoot…
(more)Fans of Dumas' might not agree, but "The Three Musketeers" is at best "just" period-conditioned consumable reading, excessively naive and heavily romanticized. Directors attempting to adapt the book were aware of its limitations and the resulting risks for today's audience, often opting for exaggeration and comedic…
(more)EvilPhoEniX–Hit Man(2023)
Richard Linklater is quite an unexplored director for me, his work has always passed me by, so I didn't have high expectations and I wasn't too impressed either. The action was non-existent, the humour minimal to nonexistent and the whole thing hinged on the likable duo of Glen Powell and the beautiful Adria Arjona,…
(more)Most Visited Actors and Actresses
Adria Arjona (actressactress, born 1992) |
Glen Powell (actor / screenwriter / produceractor / screenwriter, born 1988) |
Ryan Gosling (actor / producer / directoractor / producer, born 1980) |
Will Smith (actor / producer / composeractor / producer, born 1968) |
Anya Taylor-Joy (actressactress, born 1996) |
Johnny Depp (actor / producer / directoractor / producer, born 1963) |
Most Visited Creators
Richard Linklater (director / screenwriter / producerdirector / screenwriter, born 1960) |
Terry Gilliam (director / screenwriter / actordirector / screenwriter, born 1940) |
Olmo Omerzu (director / screenwriter / actordirector / screenwriter, born 1984) |
Xavier Gens (director / screenwriter / producerdirector / screenwriter, born 1975) |
David Leitch (director / producer / actordirector / producer, born 1969) |
Ridley Scott (director / producer / actordirector / producer, born 1937) |
Birthdays Today
Birthdays Tomorrow
Most Watched Videos
Arcane: League of Legends - Season 2 (2024) |
Re:Monster (2024) |
Demon Slayer - Hashira Training Arc (2024) |
Karaoke (2022) |
Longlegs (2024) |
Craig Before the Creek (2023) |
Most Visited Galleries
Hit Man (2023) |
Star Wars: The Acolyte - Episode 3 (2024) |
Bad Boys: Ride or Die (2024) |
The Tattooist of Auschwitz (2024) |
Under Paris (2024) |
Skazana - Season 4 (2024) |
Skating in oil! A meta espionage action whirlwind with many incredible twists and turns. Matthew Vaughn takes the viewer for a ride on several levels and yet it's seamlessly coherent and everything makes perfect sense in the end, no matter how absurd the genre crutch. Sam Rockwell is terrific, and the train fight with…
(more)